Transfer-time gaps
Line-interactive switches to battery with a short break. A server mid-write or an ATM mid-transaction may not survive it.
Gurukrupa · Power Continuity
True online double-conversion for servers, branch IT, POS and security systems — zero transfer time, a clean sine-wave output, on Delta and BPE Ablerex platforms.
Free power audit included. Sized to your load and backup time, not a catalogue guess.
The problem Gurukrupa solves
Servers, network racks, POS, CCTV and lab instruments don't tolerate gaps or dirty waveforms. The failure is rarely dramatic — a corrupted transaction, a dropped RAID array, a camera that was off for the ten seconds that mattered.
Line-interactive switches to battery with a short break. A server mid-write or an ATM mid-transaction may not survive it.
Stepped or simulated-sine output stresses switch-mode PSUs, shortens hardware life, and corrupts sensitive electronics invisibly.
Between the meter and the rack, the supply is never as clean as the nameplate says. One spike can corrupt stored data.
Online double-conversion removes all three — the load runs continuously off the inverter, on clean power, with no transfer at all.
True Online Double-Conversion
The UPS rectifies incoming AC to DC, then rebuilds a clean sine wave continuously — so the load always sits behind the inverter. When mains fails, there is nothing to switch. The output does not blink.
VFI Online
IEC 62040-3
Zero ms
Transfer time
Why buy from Gurukrupa
We size against your real load and required backup time, not a fixed catalogue.
Supplied as an authorised Delta and BPE Ablerex partner. Not grey-market stock.
Our own engineers install and commission every unit. No subcontracting.
A branch office outside a metro is not left waiting. 24/7 cover, written SLAs.
Applications
A corrupted POS transaction or a dropped server write is a business event. The UPS is what separates the two.
How Gurukrupa works
Real load and backup requirement measured — not guessed.
UPS and battery sized to your load and runtime.
Authorised Delta / BPE Ablerex stock only.
Our engineers deploy. No subcontracting.
Load test, battery runtime check, formal handover.
24/7 cover, preventive visits, written SLAs.
"We have occupied 14 floors, with 900+ people working in one of the most modern offices dealing in financial services. For uninterrupted power supply we chose Gurukrupa Enterprises — they supplied us 200 kVA, 80 kVA and 60 kVA units in multiple numbers. We find the UPS performance very good and to our satisfaction. After-sales service has been very good, and we have placed orders across India."
Specifications
Give us the connected load and the backup time you need. A free power audit confirms the real requirement first, then we size the UPS and battery precisely.
Request a Specification Quote →One honest boundary
For a non-critical desktop that just needs a few minutes to save and shut down, a cheaper line-interactive UPS is often enough — and we'll say so. Online double-conversion is for loads that cannot tolerate transfer time or dirty power. We'll recommend the right topology, not the more expensive one.
FAQ
An online (double-conversion) UPS rectifies incoming AC to DC, then continuously rebuilds a clean sine wave from that DC to power your load — the load never runs directly off raw mains. When mains fails, there is nothing to switch over, so the output does not blink. This is different from a line-interactive UPS, which normally passes mains through and only switches to battery during an outage.
For servers, POS terminals, network racks, CCTV and lab instruments, online double-conversion is the right choice — these loads cannot tolerate even a brief transfer gap or a dirty waveform. For a non-critical desktop that just needs a few minutes to save work and shut down safely, a cheaper line-interactive UPS is often enough. We size against your actual equipment, not a default recommendation.
Sizing depends on your connected load (in kVA) and how long you need it to run on battery during an outage. We run a free on-site power audit to measure your real load and confirm the backup time you actually require, then size the UPS and battery bank precisely — not off a guessed nameplate total.
Yes — the full single-phase range runs from 1 kVA to 30 kVA, including 1, 2, 3, 5, 6, 10, 15, 20 and 30 kVA ratings, on Delta and BPE Ablerex platforms. Click a rating above to request a quote for that specific unit, or share your load with us and we'll confirm the right size.
Both form factors are available across the range. Tower units suit a standalone installation next to a desk or equipment rack; rack-mount units are built for 19-inch server racks and network cabinets. The right choice depends on your site — we'll confirm during the power audit.
Yes. Our own engineers install and commission every unit — no subcontracting. Units support RS232/SNMP for remote monitoring. AMC coverage is backed by 145+ PAN-India service centres with 24/7 support, and preventive-visit schedules and response-time SLAs are written into the contract.
Gurukrupa · PAN-India
Share your connected load and required runtime — an engineer will size the UPS and battery, send a quote, and book a free power audit.